TESTING
End-of-Production Cycle Tests
END-OF-PRODUCTION-CYCLE TESTS’ means all those safety testing activities carried out after a production batch has been carried out. For which the customer requires the intervention of an ISO 17025 accredited lab, generally because inside he does not have all the necessary/calibrated equipment, or the specific competence, or they need to have them performed by a third party (case of the Expert reports).
MEQUIPE, carries out ISO 17025 accredited PARTIAL TESTS to meet all the needs of manufacturers of:
- Medical devices
- Electrical and electronic equipment for domestic, industrial and similar use
- Luminaires
- Electronic information technology (IT) equipment
- Audio visual (AV) Equipment
- Fire fighting systems
Here is a list of the main tests:
- Measurement of contact and dispersion currents
- Measurement of the resistance of Earth’s conductors
- Flame test with needle
- Glow wire test
- Insulation resistance test
- Dielectric stiffness test
- Overtemperature measurements
- Fault tests
- Environmental tests
- IP tests
As for COMPLETE TESTS, also PARTIAL TESTS can be carried out both at our labs and and at the customer’s production site..
Ask for a Quote
Scarica il Modulo per la richiesta di un preventivo